Preparing Machinery for Safe Transportation
Important packing considerations for machinery, from preparation and protection to loading and securing.
Introduction
Moving machinery requires careful preparation. A single oversight can lead to damage, delays, or safety risks during handling.
Planning ahead helps machinery arrive in good condition and ready for installation.
Assess the Machinery
Review the size, weight, lifting points, and any sensitive components before planning the move.
Take photos and record the condition of the machinery before packing.
Dismantling When Needed
Large machines may need to be dismantled into sections for safer handling.
Components should be labeled and recorded so they can be reassembled correctly at the destination.
Protecting Components
Clean and dry the machinery before packing.
Protective wrapping, VCI materials, and vacuum aluminium foil can help prevent corrosion during transit and storage.
Packing and Securing
Place the machinery on a strong wooden skid and secure it with bolts, blocking, and bracing.
Choose between a crate or a fully enclosed case depending on the level of protection required.
Best suited for: Machinery relocations, export shipments, and long-distance transport.
Loading and Unloading
Use suitable lifting equipment and follow the marked lifting points.
Secure the packed machinery inside the container or on the truck before departure.
How PMI Can Help
PMI supports machinery transportation with industrial packing, loading, cargo securing, and unpacking services.



